Moving checklist for Finland: water, appliances and pipes

Change of address and removal help in good time, appliances disconnected and reconnected, the water meter reading saved – so water and appliances are not forgotten.

A typical moving list reminds you about the change of address and cardboard boxes, but water and appliances are easy to forget. Then the dishwasher waits weeks to be connected at the new home, or an open connection is left behind in the old one. This checklist follows the moving timeline and focuses on everything related to water, pipes and appliances.

Four weeks before the move

  • Book removal help. The most popular days, such as the turn of the month and weekends, go first. You can book the move, for example, from our partner Mover.fi.
  • Make the notification of move. You can make it at the earliest three months before the move, and one notification goes to both Posti and the Digital and Population Data Services Agency (DVV).
  • Electricity, home insurance and internet. Make a new electricity contract and move your home insurance and internet subscription to the new address.
  • Rented flat. Check the notice period in your tenancy agreement and agree on handing over the flat with the landlord.

Two weeks before

  • Check the connections at the new home. Is there a valve under the sink and a dishwasher outlet on the trap? Does the washing machine have its own valve and a floor drain? Ask the previous resident or the landlord for photos.
  • Book appliance disconnection and connection. Dishwasher disconnection costs €47.06 and connection at the new home €125.50; washing machine connection costs €78.44. See appliances when moving.
  • Leak tray. Many housing companies and insurers require a leak tray under the dishwasher. If the new home has none, it is easiest to fit during connection – read more about dishwasher leak trays.
  • Housing company. Tell the maintenance company or property manager about the move and ask how parking for the van and use of the lift are arranged.

One week before

  • Find the washing machine's transport bolts and the appliance manuals. See our guide to moving a washing machine.
  • Use up the food in the freezer and plan to defrost it a day before the move.
  • Pack a separate box with first-day essentials: towels, toilet paper, washing-up liquid and a torch.

Moving day at the old home

  1. Close the valves of the washing machine and dishwasher if they have not been disconnected yet.
  2. Take a photo of the water meter reading if the flat has its own meter.
  3. Check that no tap is left dripping and that no open connections are left under the sink.
  4. Do the move-out cleaning or make sure the booked cleaning is confirmed.

First day at the new home

  • Find the main stop valve. Find out where the water to the flat is shut off – the flat's own stop valve is often in the kitchen, the bathroom or a hallway cupboard. See what to do in our article on a water leak at home.
  • Look under the sink. A damp cabinet floor or a stain under the trap means a leak.
  • Test the taps and toilet. Does the toilet keep running or a tap drip? Small faults are easiest to fix right away.
  • Read the water meter and take a photo of the reading.
  • Report faults straight away. In a rented flat, report any defects to the landlord in writing at the start so that they are not later blamed on you.

Once the machines are in place, we connect them to water and drain and test them. Send a photo of the sink cabinet or the washing machine spot, and we can see in advance what the connection needs.

FAQ

Frequently asked questions

When must the notification of move be made in Finland?

You can make it at the earliest three months before the move, and it must be made within one week of moving day. One notification goes to both Posti and the Digital and Population Data Services Agency (DVV).

Who disconnects the dishwasher when moving?

Disconnecting and connecting a dishwasher is plumbing work, while the removal company handles transport. If you book both in good time, the machine is disconnected before the van arrives and connected soon after.

Should I take a water meter reading when moving?

If the flat has its own water meter, take a photo of the reading on moving day at both the old and the new home. Many housing companies bill water by meter, and the photo helps if there are questions about the bill.

Contact

Ask a plumber

Tell us briefly what needs doing and where. A photo of the site helps us assess the job – you can send it via WhatsApp.

Six short steps. The more you tell us, the more accurate the quote we can give you. Fill in the form and send it from the end of the page.

Step 1 of 6What needs doing?

Pick the jobs and describe in your own words what needs to be done. Fixed-price jobs show a price estimate straight away.

Choose the jobs

You can choose several. Prices include VAT.

Quantity

Estimate for the selected jobs

What should be installed, replaced or repaired? What has happened to the current fixture or pipe?

Step 2 of 6The property

Property details help us estimate the scope of the work and what needs to be agreed with the housing company.

Property type
I’m making this request as

In Finland, the street-level floor is floor 1.

Does the building have a lift? (optional)
Does the flat have its own shut-off valves? (optional)

They let the water be shut off for your flat only instead of the whole building.

Has a renovation notice (muutostyöilmoitus) been sent to the housing company? (optional)

In a housing company (taloyhtiö), plumbing work usually requires a written renovation notice to the property manager before the work starts. Read when a notice is needed

You can also give the exact address later.

Five digits, e.g. 00100.

Step 3 of 6Fixtures and parts

Tell us about the fixtures and add photos – photos help us price the job accurately.

Have you already bought the new fixture or appliance? (optional)
Should the old one be removed and taken away? (optional)

Photos of the site (optional)

Photos help us price the job accurately: the current fixture, connections, valves and the space. Up to 6 photos, 8 MB each.

Step 4 of 6Timing

When would suit you? The exact time is always agreed together.

How soon should the work be done?

Water leak? Shut off the water first – see the guide.

Preferred dates (optional)

You can add up to 3 dates.

Suitable times (optional)
Step 5 of 6Contact details

Who is the quote for, and how would you like to be contacted?

E.g. 040 123 4567 or +358 40 123 4567.

Required if you’d like to be contacted by email.

How would you like to be contacted?

Tell us which language is easiest for you. This is a preference – we’ll confirm the language when we get in touch.

The quote is for

Format 1234567-8.

For the household tax credit, the labour share is itemised on the invoice. The credit does not cover, for example, installing an appliance as a stand-alone job, or work that is the housing company’s responsibility.

A code won in the Pipe Puzzle is added here automatically.

Step 6 of 6Review and send

Check the details before sending. You can still edit any step.

Fields marked with an asterisk (*) are required.