New kitchen

IKEA kitchen installation: cabinets, sink, tap and dishwasher

We assemble kitchen cabinets (from €60/h) and do the kitchen plumbing at fixed prices: sink €156.88–235.31, tap €125.50 and dishwasher €125.50. Order the whole kitchen or just the connections.

  • Kitchen cabinet assemblyfrom €60/h
  • Sink – installation / replacement€156.88–235.31
  • Faucet – replacement€125.50
  • Dishwasher – installation and connection€125.50
Request a quote

The kitchen plan or product list and a photo of the room are often enough for a price estimate.

The whole kitchen or just the connections

Installing an IKEA kitchen comes in two parts: assembling the cabinets, doors and drawers, and making the water and drain connections. You can order both from us, so one provider is responsible for the whole kitchen, or assemble the cabinets yourself and have us do just the connections.

The connections are best left to a professional, because a badly made joint under the sink is one of the most common causes of water damage in Finnish kitchens. We install the sink with its waste and trap, fit the tap and connect it to the water supply, and connect the dishwasher to water and drain. Finally we test everything and check that every joint stays dry.

  • Assembling and fixing cabinets, doors and drawers
  • Sink installation with waste and trap
  • Tap installation and connection to the water supply
  • Dishwasher connection to water and drain
  • Leak check and test run

Cabinet assembly

We assemble base cabinets, wall cabinets, drawer units and doors, fix the cabinets to the wall and adjust the doors and drawers. Assembly is charged by the hour: from €60/h. The time depends on the size of the kitchen, so send the kitchen plan or product list and we will estimate the time in advance.

Fitting the worktop, cutting the sink and tap holes and removing the old kitchen are agreed in the quote request. Electrical work, such as a hard-wired cooker or new sockets, is done by an electrician.

Order of work

When we assemble the cabinets, we make the connections in the same visit as soon as the base cabinets and worktop are in place. If you assemble the cabinets yourself, book the connections for when the base cabinets are fixed, the worktop is in place and the sink and tap holes have been cut.

If the old kitchen is removed first, disconnecting the old sink and dishwasher counts as one of our small plumbing jobs. The connections are capped so that you can live in the flat during the renovation.

Check the parts before installation day

Kitchen sinks, taps and traps are often sold as separate products, and with some sinks the waste and trap must be bought separately. Make sure you have a trap with an outlet for the dishwasher drain hose. Taps usually come with flexible connection hoses.

The dishwasher takes its water from a dishwasher valve on the tap or from a separate valve under the sink. If the tap you chose has no dishwasher valve, tell us in advance so that a suitable valve is with us on the day. Extra fittings and hoses are charged separately.

It is worth fitting a leak tray under the dishwasher at the same time – many insurers and housing companies require one. Keep all the parts and instructions that came with the products; the manufacturer's terms may require installation according to the instructions.

Price and the household tax credit

Cabinet assembly costs from €60/h. The connections have fixed prices: sink installation €156.88–235.31, tap installation €125.50 and dishwasher connection €125.50. Prices include 25.5% VAT. You can find every price on the price list.

You can claim the Finnish household tax credit (kotitalousvähennys) for the labour of a kitchen renovation, such as installing the cabinets, sink and tap. Connecting the dishwasher may qualify as part of a kitchen renovation, but installing an appliance on its own does not. Read more in our article on the household tax credit for plumbing.

Before we arrive

  1. Keep the kitchen plan or product list – it speeds up assembly and the estimate.
  2. The cabinets, doors, sink, tap and dishwasher have been delivered to the site.
  3. The old kitchen has been removed, or its removal has been agreed.
  4. If you assemble the cabinets yourself: the base cabinets are fixed, the worktop is in place and the sink hole is cut.
  5. There is a socket for the dishwasher inside the cabinets.
  6. You know where to shut off the water in the flat, or the water cut has been agreed with the maintenance company.

IKEA is a registered trademark of Inter IKEA Systems B.V. Solo-putkimies is not an IKEA partner – we install kitchens of any brand.

Work stages

How the job goes

  1. Tell us about the kitchen

    Send the kitchen plan or product list and a photo of the room. Tell us whether we assemble the cabinets or only make the connections. You can also call +358 45 237 3751.

  2. Estimate and schedule

    We estimate the assembly time and agree the schedule.

  3. Assembly

    We assemble and fix the cabinets and adjust the doors and drawers.

  4. Connections and test run

    We install the sink, trap and tap, connect the dishwasher and test everything.

FAQ · IKEA kitchen installation

Frequently asked questions

Do you also assemble IKEA cabinets?

Yes. We assemble and fix cabinets, doors and drawer units at an hourly rate of from €60/h. Send the kitchen plan or product list and we will estimate the time in advance. You can also assemble the cabinets yourself and order just the connections from us.

How much does kitchen installation cost?

Cabinet assembly costs from €60/h. Sink installation costs €156.88–235.31, tap installation €125.50 and dishwasher connection €125.50. Prices include 25.5% VAT, and any extra fittings and hoses are charged separately. You only pay for the jobs you need.

Can the old connections be used in the new kitchen?

Often yes, if the water pipes and drain come out roughly where they did before. If the sink moves to a new spot, the connections have to be extended or moved. Send a photo of the current connections and the new floor plan, and we will estimate the extra work in advance.

Does the dishwasher need a leak tray?

Many insurers and housing companies require a leak tray under the dishwasher. In a new kitchen it is easiest to fit while the machine is being connected. Read more in our article on dishwasher leak trays.

Do you connect kitchens from other brands too?

Yes. Sink, tap and dishwasher connections are the same whatever the brand of the kitchen, so the prices are the same for every kitchen.

Contact

Request a quote or ask a question

Tell us briefly what needs doing and where. A photo of the job helps us estimate the work.

Six short steps. The more you tell us, the more accurate the quote we can give you. Fill in the form and send it from the end of the page.

Step 1 of 6What needs doing?

Pick the jobs and describe in your own words what needs to be done. Fixed-price jobs show a price estimate straight away.

Choose the jobs

You can choose several. Prices include VAT.

Quantity

Estimate for the selected jobs

What should be installed, replaced or repaired? What has happened to the current fixture or pipe?

Step 2 of 6The property

Property details help us estimate the scope of the work and what needs to be agreed with the housing company.

Property type
I’m making this request as

In Finland, the street-level floor is floor 1.

Does the building have a lift? (optional)
Does the flat have its own shut-off valves? (optional)

They let the water be shut off for your flat only instead of the whole building.

Has a renovation notice (muutostyöilmoitus) been sent to the housing company? (optional)

In a housing company (taloyhtiö), plumbing work usually requires a written renovation notice to the property manager before the work starts. Read when a notice is needed

You can also give the exact address later.

Five digits, e.g. 00100.

Step 3 of 6Fixtures and parts

Tell us about the fixtures and add photos – photos help us price the job accurately.

Have you already bought the new fixture or appliance? (optional)
Should the old one be removed and taken away? (optional)

Photos of the site (optional)

Photos help us price the job accurately: the current fixture, connections, valves and the space. Up to 6 photos, 8 MB each.

Step 4 of 6Timing

When would suit you? The exact time is always agreed together.

How soon should the work be done?

Water leak? Shut off the water first – see the guide.

Preferred dates (optional)

You can add up to 3 dates.

Suitable times (optional)
Step 5 of 6Contact details

Who is the quote for, and how would you like to be contacted?

E.g. 040 123 4567 or +358 40 123 4567.

Required if you’d like to be contacted by email.

How would you like to be contacted?

Tell us which language is easiest for you. This is a preference – we’ll confirm the language when we get in touch.

The quote is for

Format 1234567-8.

For the household tax credit, the labour share is itemised on the invoice. The credit does not cover, for example, installing an appliance as a stand-alone job, or work that is the housing company’s responsibility.

A code won in the Pipe Puzzle is added here automatically.

Step 6 of 6Review and send

Check the details before sending. You can still edit any step.

Fields marked with an asterisk (*) are required.